Reservoir Parameter Calculations from D.S.T. Pressure Analysis

$10.00

J.F. Cuesta, Johnston Testers

31ST ANNUAL TECHNICAL MEETING OF THE PETROLEUM SOCIETY OF CIM
IN CALGARY, MAY 25 – 28, 1980

1980

Abstract

Pressure build up and drawdown analysis applied to D. S. T. shut-in and flow periods is reviewed.